Challenges in Bridge Construction over a canal of crocodiles at an extremely remote location thirty years ago
|
Détails bibliographiques
Auteur(s): |
Ashit Kundu
Saprava Bhattacharya |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Publié dans: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-7 | ||||
Nombre total de pages (du PDF): | 7 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813815776223 | ||||
Abstrait: |
Many bridge structures are built all over the world with numerous challenges. The construction of a cable suspended bridge in the mid seventies at a extremely remote village of Andaman & Nicobar Island was a real challenge since there was hardly any proper equipment available, as well as a lack of skilled man power. These challenges may be dealt with proactive initiatives and executable planning by experienced professionals. Matters could become beyond control if further challenges from wild animals are encountered. This paper is the challenges faced during the construction of a bridge built more than thirty years ago in the extremely remote village of Andaman and Nicobar Islands over a canal of crocodiles. |
||||
Mots-clé: |
pont suspendu
|