Case Study of Two U.S. Bridge Projects Using Prefabricated Bridge Elements Connected with Ultra-High Performance Fiber-Reinforced Concrete (UHPFRC)

 Case Study of Two U.S. Bridge Projects Using Prefabricated Bridge Elements Connected with Ultra-High Performance Fiber-Reinforced Concrete (UHPFRC)
Auteur(s):
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 2691-2698
DOI: 10.2749/vancouver.2017.2691
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

Accelerated bridge construction (ABC) techniques were used to rehabilitate two notable bridge structures in the United States in 2016; a 16.5-meter (54-foot) long, single-span superstructure carryi...
Lire plus

Détails bibliographiques

Auteur(s): (Ductal® - LafargeHolcim, Chicago, IL, USA)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 2691-2698 Nombre total de pages (du PDF): 8
Page(s): 2691-2698
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.2691
Abstrait:

Accelerated bridge construction (ABC) techniques were used to rehabilitate two notable bridge structures in the United States in 2016; a 16.5-meter (54-foot) long, single-span superstructure carrying U.S. Route 30 over Bessemer Avenue near Pittsburgh, Pennsylvania and; a 5-span 308- meter (1,011-foot) long historic concrete arch bridge carrying Franklin Avenue over the Mississippi River near Minneapolis, Minnesota. These projects utilized prefabricated bridge elements (PBEs) that were connected together on-site using Ultra-High Performance Fiber-Reinforced Concrete (UHPFRC). Different UHPFRC mix designs, supplied by LafargeHolcim, were used for each project. A rapid-set mix used for the Pittsburgh project allowed the single-span superstructure to be replaced during a 57-hour weekend road closure, while the Minneapolis project utilized a standard-set mix. In both cases, UHPFRC was used for its ability to rapidly achieve high strength as well as provide simple, strong, durable connections between the prefabricated elements.