Calli Extradosed Bridge: Fast track project for an extradosed bridge in seismic area

 Calli Extradosed Bridge: Fast track project for an extradosed bridge in seismic area
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 677-682
DOI: 10.2749/vancouver.2017.0677
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.28 MB

Calli Bridge, in Antalya city center, is the first extradosed bridge in Turkey. This 180m long bridge is composed of an 80m main span and two side spans of 50m. The concrete deck is a twin pi-secti...
Lire plus

Détails bibliographiques

Auteur(s): (Freysas-Freyssinet, Istanbul, Turkey)
(Freysas-Freyssinet, Istanbul, Turkey)
(Freysas-Freyssinet, Istanbul, Turkey)
(Freyssinet, Paris, France)
(Freyssinet, Paris, France)

(Freyssinet, Paris, France)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 677-682 Nombre total de pages (du PDF): 6
Page(s): 677-682
Nombre total de pages (du PDF): 6
Année: 2017
DOI: 10.2749/vancouver.2017.0677
Abstrait:

Calli Bridge, in Antalya city center, is the first extradosed bridge in Turkey. This 180m long bridge is composed of an 80m main span and two side spans of 50m. The concrete deck is a twin pi-section of 2.5m in depth and 15m wide, making the bridge 30m wide. The extradosed PT cables are composed of 2 sets of 4 cables 31HDE15 per pi-section that will go through 3 pylons of 7m height, using Freyssinet saddles and cohestrand technology. For the first time worldwide, a 1,960MPa ultimate tensile strength strand is used, which has a direct impact on pylon’s dimensions. As Antalya is located in high seismic hazard zone, a base isolation using LRB has been proposed. Thanks to this innovative concept for Calli Bridge of combining extradosed cables with base isolation and high strength strands, a cost effective solution has been reached. With the control of the overall supply chain of specific equipments, conception and construction were managed in only 7 months.