0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Bridge failures analysis as a risk mitigating tool

 Bridge failures analysis as a risk mitigating tool
Auteur(s): ,
Présenté pendant IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, publié dans , pp. 304-310
DOI: 10.2749/guimaraes.2019.0304
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.7 MB

The research background as a database of bridge failures was created by author at the place of main work in 2006 - 2015 for improving design. Since 2015, an initiative to collect and analyse data o...
Lire plus

Détails bibliographiques

Auteur(s): (JSC “Transmost”, St. Petersburg, Russia)
(HOJ Consulting, Brunnen, Switzerland)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Publié dans:
Page(s): 304-310 Nombre total de pages (du PDF): 7
Page(s): 304-310
Nombre total de pages (du PDF): 7
DOI: 10.2749/guimaraes.2019.0304
Abstrait:

The research background as a database of bridge failures was created by author at the place of main work in 2006 - 2015 for improving design. Since 2015, an initiative to collect and analyse data on failures and collapses of bridges was continued by Working Commission 1 of IABSE, since 2017 - by the Target Group 1.5. For further study, the information concerning highway and pedestrian bridges collapsed over last 52 years was selected. The consequences for human life and health were defined at the rate of fatalities and injured persons. Also the types of crucial human errors or other force majeure, hazards and causes were analysed. The tendency of failures number increasing correlating with operating life cycle period was revealed. The ways of future TG1.5 research activity development are outlined aiming to the relevant risks mitigation. Some proposals for the risk management measures are presented.

Mots-clé:
pont cycle de vie