Bridge Construction Management
|
Détails bibliographiques
Auteur(s): |
R. K. Dhiman
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Publié dans: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-5 | ||||
Nombre total de pages (du PDF): | 5 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813808412215 | ||||
Abstrait: |
There is urgent need to manage long span bridge project efficiently to compete with technological challenges. Construction management basically a tool to complete the project effectively within fixed amount but in less time. Manager should have detailed knowledge of sequence of all the activities. Decision making for both side contractor and client needs to be fast and time bound otherwise the project will get delayed which will have time and cost over run. Control in form of reviewing monitoring has a catalystic effect to boost the progress. Various aspects for effective construction management of long span bridges has been discussed in this paper. |