Automated framework for optimized path-planning for pile foundation drilling machines based on 4D BIM modelling

 Automated framework for optimized path-planning for pile foundation drilling machines based on 4D BIM modelling
Auteur(s): , , ,
Présenté pendant IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, publié dans , pp. 1949-1956
DOI: 10.2749/ghent.2021.1949
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

While the Building Information Modeling (BIM) method allows accurate information modelling and thus more robust predictions, it often needs to be combined with tasks beyond the model or modelling p...
Lire plus

Détails bibliographiques

Auteur(s): (Bauhaus-Universität Weimar)
(Bauhaus-Universität Weimar)
(Bauhaus-Universität Weimar)
(Bauhaus-Universität Weimar)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Publié dans:
Page(s): 1949-1956 Nombre total de pages (du PDF): 8
Page(s): 1949-1956
Nombre total de pages (du PDF): 8
DOI: 10.2749/ghent.2021.1949
Abstrait:

While the Building Information Modeling (BIM) method allows accurate information modelling and thus more robust predictions, it often needs to be combined with tasks beyond the model or modelling phase, especially if the goal is a model-based construction phase. This study proposes an optimization workflow for the construction of pile foundations, since they are part of a varying range of building and infrastructure projects. Pile foundation drilling is an extensive construction process, which can be optimized significantly by reducing the execution length through an effective drilling path plan and automated data transfer. This was achieved through the combination of optimization algorithms, which were linked to the 3D BIM model and selected the shortest distance between piles using Ant Colony Optimization (ACO) algorithm, based on the Travelling Salesperson Problem (TSP). Subsequently the script created separate security distance-compliant tours for drilling machines, calculated construction times and converted the resulting paths into schedules, which in turn could be updated to the 3D BIM model to generate a 4D animation of the construction process. The developed optimization framework and script were tested with a construction company focused on special foundations based in Germany.

Mots-clé:
BIM Building Information Modeling