0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Assessment of existing bridges based on probabilistic methods – Background and proposal for a practical approach

 Assessment of existing bridges based on probabilistic methods – Background and proposal for a practical approach
Auteur(s): , ,
Présenté pendant IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, publié dans , pp. 300-301
DOI: 10.2749/222137813806479070
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.18 MB

The maintenance of existing civil engineering structures is becoming ever more important. The consequence of this is that the realistic assessment of existing structures both from a static - design...
Lire plus

Détails bibliographiques

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Publié dans:
Page(s): 300-301 Nombre total de pages (du PDF): 8
Page(s): 300-301
Nombre total de pages (du PDF): 8
Année: 2013
DOI: 10.2749/222137813806479070
Abstrait:

The maintenance of existing civil engineering structures is becoming ever more important. The consequence of this is that the realistic assessment of existing structures both from a static - design point of view as well as in respect of the remaining service life will be one of the main tasks of engineers in the future. Amongst the various scientific methods for assessing the load bearing capacity and serviceability are probabilistic calculation methods. Using these methods, it is possible, based on stochastic models for the loads and resistances to determine, in particular, the failure probability or the reliability of civil engineering structures. The report presents a practical procedure for the assessment of existing structures with the help of probabilistic calculation methods. The advantages of these methods are demonstrated using the example of a 440 m long existing prestressed concrete bridge.