The Afsluitdijk forms 32 km of the primary sea defence of the Netherlands. The Afsluitdijk was built as a closure dam in 1932 and separates the IJsselmeer from the Wadden-Sea and North Sea. Because...
Lire plus

Détails bibliographiques

Auteur(s): (Delta Marine Consultants (BAM), Gouda, The Netherlands)
(Delta Marine Consultants (BAM), Gouda, The Netherlands)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Publié dans:
Page(s): 256-264 Nombre total de pages (du PDF): 9
Page(s): 256-264
Nombre total de pages (du PDF): 9
DOI: 10.2749/ghent.2021.0256
Abstrait:

The Afsluitdijk forms 32 km of the primary sea defence of the Netherlands. The Afsluitdijk was built as a closure dam in 1932 and separates the IJsselmeer from the Wadden-Sea and North Sea. Because of climate change the Afsluitdijk needs to be strengthened. A higher crest height is required to limit overtopping at higher water levels due to sea level rise. Heavier armour is required to protect the Afsluitdijk from higher wave heights. Because of the historic value of the Afsluitdijk, stringent architectural requirements are in place on the visual appearance of the dam after strengthening [1]. Therefore, a new concrete armour unit was developed to provide protection of the seaward side of the Afsluitdijk. This armour unit is called XblocPlus. The development of the armour unit is based on the breakwater armour unit Xbloc which has been applied since 2004. A saving of 56% on CO2 footprint was achieved compared to the Clients reference design.

Copyright: © 2021 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Ouvrages et projets