Aerodynamic Challenges and Solutions of Ultra Long Span Cable Stayed Bridges
|
Détails bibliographiques
Auteur(s): |
Ngai Yeung
Matt Carter Jung-hwi Noh Sang-Hoon Lee |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Publié dans: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 532-539 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/222137912805110817 | ||||
Abstrait: |
This paper introduces the aerodynamic challenges of ultra long span cable stayed bridges with a main span exceeding 1,200m and provides technical solutions based on the specimen design of a 1,400m main span partially earth anchored cable stayed bridge. An innovative tie cable technology is introduced which makes the construction feasible and allows a 30% reduction in the steel deck quantities compared to a bridge built by the traditional cantilever method. |