ABC on LBJ Express Project – Innovative bent cap design and beam placement

 ABC on LBJ Express Project – Innovative bent cap design and beam placement
Auteur(s): , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 2607-2614
DOI: 10.2749/vancouver.2017.2607
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

The LBJ Express project rebuilt one of the most congested highways in Texas. Precasting most of the straddle bents that supported the 9-mile depressed section allowed for a fast construction and er...
Lire plus

Détails bibliographiques

Auteur(s): (Ferrovial Agroman US Corp, Austin, TX, USA)
(Ferrovial Agroman US Corp, Austin, TX, USA)
(Ferrovial Agroman US Corp, Austin, TX, USA)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 2607-2614 Nombre total de pages (du PDF): 8
Page(s): 2607-2614
Nombre total de pages (du PDF): 8
Année: 2017
DOI: 10.2749/vancouver.2017.2607
Abstrait:

The LBJ Express project rebuilt one of the most congested highways in Texas. Precasting most of the straddle bents that supported the 9-mile depressed section allowed for a fast construction and erection of the bents. In order to maintain the existing traffic at all times, some bent caps were constructed in several phases, and post-tensioning was used to connect different bent segments. For the IH-35E section, composite straddle bents were placed overnight in a single operation that allowed for a reduction of the original schedule. Existing cross bridges along I-635 created constructability issues because of low vertical clearance and crane placement constraints. An 82 meter long custom-built truss system enabled each beam to be carried transversely, moving across the bent cap to its final location, accelerating the bridge construction. This paper describes in detail some of these innovative designs and how they were implemented during construction.

Mots-clé:
ponts