3 in 1 reconstruction of monument Margaret Danube-bridge in Budapest, Hungary
|
Détails bibliographiques
Auteur(s): |
Tamás Németh
Zsolt Nagy Adrián Horváth |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013 | ||||
Publié dans: | IABSE Conference, Rotterdam, May 2013 | ||||
|
|||||
Page(s): | 252-253 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813806478945 | ||||
Abstrait: |
Located in the centre of the world heritage site of Budapest, monument Margaret Danube-bridge was built in 1876 and now reached the age of 137 years. The bridge with 6 spans is a series of hinged single supported steel arches with six main girders and a total length of 642 m. The paper describes the implementation of major aspects raised before the reconstruction, i.e. the structural condition, the traffic development and the monument reconstruction (3 in 1) during the design and presentation of the structural consequences of the final design with interesting details. |
||||
Mots-clé: |
dalle orthotrope
|