0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Duan, Zhuocheng / de Wilde, Pieter / Attia, Shady / Zuo, Jian (2024): Prospect of energy conservation measures (ECMs) in buildings subject to climate change: A systematic review. Dans: Energy and Buildings, v. 322 (novembre 2024).

    https://doi.org/10.1016/j.enbuild.2024.114739

  2. Zhou, Simin / Yu, Rui / Pan, Min / Zuo, Jian / Tu, Bocun / Dong, Na (2024): Understanding Current Demand for BIM Professionals in China through Recruitment Data Mining. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 3 (mai 2024).

    https://doi.org/10.1061/jmenea.meeng-5439

  3. Fang, Xingyue / Chang, Ruidong / Zhang, Yanquan / Zuo, Jian / Zou, Yang / Han, Yilong (2024): Monitoring airborne particulate matter from building construction: A systematic review. Dans: Journal of Building Engineering, v. 86 (juin 2024).

    https://doi.org/10.1016/j.jobe.2024.108708

  4. Zhang, Youxi / Liu, Yu / Yu, Rui / Zuo, Jian / Dong, Na: Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-04-2023-0392

  5. Hu, Zhibin / Wu, Guangdong / Zheng, Junwei / Zhao, Xianbo / Zuo, Jian (2023): Unravelling Effects of Project Complexity on Project Success and Project Management Success: a Meta-Analytic Review. Dans: Journal of Civil Engineering and Management, v. 29, n. 6 (22 août 2023).

    https://doi.org/10.3846/jcem.2023.19553

  6. Zhang, Jingxiao / Zhu, Zhe / Liu, Hongyong / Zuo, Jian / Ke, Yongjian / Philbin, Simon P. / Zhou, Zhendong / Feng, Yunlong / Ni, Qichang (2023): System Framework for Digital Monitoring of the Construction of Asphalt Concrete Pavement Based on IoT, BeiDou Navigation System, and 5G Technology. Dans: Buildings, v. 13, n. 2 (14 février 2023).

    https://doi.org/10.3390/buildings13020503

  7. Liu, Yu / Chang, Rui-dong / Zuo, Jian / Xiong, Feng / Dong, Na (2021): What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders. Dans: Engineering, Construction and Architectural Management, v. 30, n. 2 (octobre 2021).

    https://doi.org/10.1108/ecam-06-2021-0538

  8. Tu, Bocun / Zuo, Jian / Chang, Rui-dong / Webber, Ronald J. / Xiong, Feng / Dong, Na (2022): A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study. Dans: Engineering, Construction and Architectural Management, v. 30, n. 4 (mars 2022).

    https://doi.org/10.1108/ecam-10-2021-0895

  9. Jin, Xiao-Hua / Zhang, Guomin / Zuo, Jian / Lindsay, Stephen (2013): Sustainable High-rise Design Trends – Dubai’s Strategy. Dans: Civil Engineering and Architecture, v. 1, n. 2 (août 2013).

    https://doi.org/10.13189/cea.2013.010201

  10. Huang, Yao / Shi, Qian / Zuo, Jian / Peña-Mora, Feniosky / Chen, Jindao (2021): Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).

    https://doi.org/10.1155/2021/6674980

  11. Ding, Zhikun / Zuo, Jian / Wang, Jiayuan / Zillante, George (2016): Searching for niche market for engineering consultants. Case of regional supervision systems in China. Dans: Engineering, Construction and Architectural Management, v. 23, n. 5 (septembre 2016).

    https://doi.org/10.1108/ecam-09-2015-0132

  12. Zuo, Jian / Zhao, Xianbo / Nguyen, Quan Bui Minh / Ma, Tony / Gao, Shang (2018): Soft skills of construction project management professionals and project success factors. A structural equation model. Dans: Engineering, Construction and Architectural Management, v. 25, n. 3 (avril 2018).

    https://doi.org/10.1108/ecam-01-2016-0016

  13. Wang, Yang / Liu, Jing / Zuo, Jian / Rameezdeen, Raufdeen (2020): Ways to improve the project management efficiency in a centralized public procurement system. A structural equation modeling approach. Dans: Engineering, Construction and Architectural Management, v. 27, n. 1 ( 2020).

    https://doi.org/10.1108/ecam-12-2018-0560

  14. Li, Jingru / Zuo, Jian / Jiang, Weiping / Zhong, Xizeng / Li, Jinggang / Pan, Yulun (2020): Policy instrument choice for construction and demolition waste management: the case study of Shenzhen, China. Dans: Engineering, Construction and Architectural Management, v. 27, n. 6 ( 2020).

    https://doi.org/10.1108/ecam-11-2019-0632

  15. Li, Jingru / Zuo, Jian / Wang, Gang / He, Gaihong / Tam, Vivian W. Y. (2020): Stakeholders’ willingness to pay for the new construction and demolition waste landfill charge scheme in Shenzhen: A contingent valuation approach. Dans: Sustainable Cities and Society, v. 52 (janvier 2020).

    https://doi.org/10.1016/j.scs.2019.101663

  16. He, Qinghua / Wang, Zilun / Wang, Ge / Zuo, Jian / Wu, Guangdong / Liu, Bingsheng (2020): To be green or not to be: How environmental regulations shape contractor greenwashing behaviors in construction projects. Dans: Sustainable Cities and Society, v. 63 (décembre 2020).

    https://doi.org/10.1016/j.scs.2020.102462

  17. Tian, Wei / Yang, Song / Zuo, Jian / Li, Zhanyong / Liu, Yunliang (2016): Relationship between built form and energy performance of office buildings in a severe cold Chinese region. Dans: Building Simulation, v. 10, n. 1 (septembre 2016).

    https://doi.org/10.1007/s12273-016-0314-3

  18. Palmer, Jasmine / Chiveralls, Keri / Pullen, Stephen / Zuo, Jian / Wilson, Lou / Zillante, George (2013): Transdisciplinary Charrettes: A Research Method for Sustainable Design. Dans: The International Journal of Architectonic, Spatial, and Environmental Design, v. 7, n. 1 ( 2013).

    https://doi.org/10.18848/2325-1662/cgp/v07i01/38361

  19. Shi, Qian / Yan, Yu / Zuo, Jian / Yu, Tao (2016): Objective conflicts in green buildings projects: A critical analysis. Dans: Building and Environment, v. 96 (février 2016).

    https://doi.org/10.1016/j.buildenv.2015.11.016

  20. Wang, Yang / Hu, Ning / Zuo, Jian / Rameezdeen, Raufdeen (2020): Project Management Personnel Turnover in Public Sector Construction Organizations in China. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 2 (mars 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000735

  21. Yuan, Hongping / Wu, Huanyu / Zuo, Jian (2018): Understanding Factors Influencing Project Managers’ Behavioral Intentions to Reduce Waste in Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 6 (novembre 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000642

  22. Chang, Tengyuan / Deng, Xiaopeng / Zuo, Jian / Yuan, Jingfeng (2018): Political Risks in Central Asian Countries: Factors and Strategies. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000588

  23. Wu, Guangdong / Zhao, Xianbo / Zuo, Jian (2017): Relationship between Project’s Added Value and the Trust–Conflict Interaction among Project Teams. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000525

  24. Chang, Rui-dong / Zuo, Jian / Soebarto, Veronica / Zhao, Zhen-yu / Zillante, George / Gan, Xiao-long (2016): Sustainability Transition of the Chinese Construction Industry: Practices and Behaviors of the Leading Construction Firms. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 4 (juillet 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000439

  25. Zhao, Zhen-yu / Zuo, Jian / Zillante, George (2011): Situation and Competitiveness of Foreign Project Management Consultancy Enterprises in China. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 4 (octobre 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000060

  26. Xia, Bo / O'Neill, Tim / Zuo, Jian / Skitmore, Martin / Chen, Qing (2014): Perceived obstacles to multi-storey timber-frame construction: an Australian study. Dans: Architectural Science Review, v. 57, n. 3 (janvier 2014).

    https://doi.org/10.1080/00038628.2014.912198

  27. Jin, Ruoyu / Zuo, Jian / Hong, Jingke (2019): Scientometric Review of Articles Published in ASCE's Journal of Construction Engineering and Management from 2000 to 2018. Dans: Journal of Construction Engineering and Management, v. 145, n. 8 (août 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001682

  28. Zhao, Zhen Yu / Lv, Qian Lei / Zuo, Jian / Zillante, George (2010): Prediction System for Change Management in Construction Project. Dans: Journal of Construction Engineering and Management, v. 136, n. 6 (juin 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000168

  29. Zhao, Zhen Yu / Shen, Li Yin / Zuo, Jian (2009): Performance and Strategy of Chinese Contractors in the International Market. Dans: Journal of Construction Engineering and Management, v. 135, n. 2 (février 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:2(108)

  30. Shi, Qian / Ding, Xue / Zuo, Jian / Zillante, George (2016): Mobile Internet based construction supply chain management: A critical review. Dans: Automation in Construction, v. 72 (décembre 2016).

    https://doi.org/10.1016/j.autcon.2016.08.020

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine