- A Reinforcement Learning Method for Multiasset Roadway Improvement Scheduling Considering Traffic Impacts. Dans: Journal of Infrastructure Systems, v. 28, n. 4 (décembre 2022). (2022):
- Risk Assessment of Water Inrush in Tunnel through Water-Rich Fault. Dans: Geotechnical and Geological Engineering, v. 36, n. 1 (28 août 2017). (2017):