Meisu Zhong
- An integrated quay crane - shuttle vehicle scheduling problem with apron buffer capacity constraints. Dans: Proceedings of the Institution of Civil Engineers - Maritime Engineering, v. 175, n. 4 (décembre 2022). (2022):
- Dynamic recovery actions in multi-objective liner shipping service with buffer times. Dans: Proceedings of the Institution of Civil Engineers - Maritime Engineering, v. 175, n. 2 (juin 2022). (2022):