Denghua Zhong
- Predicting and controlling the cement intake during curtain grouting of dam foundations. Dans: European Journal of Environmental and Civil Engineering, v. 26, n. 9 (décembre 2020). (2020):
- 3D Parametric Modeling of Complex Geological Structures for Geotechnical Engineering of Dam Foundation Based on T-Splines. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 7 (juin 2018). (2018):
- Earth Dam Construction Simulation Considering Stochastic Rainfall Impact. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 33, n. 6 (mai 2018). (2018):
- Probabilistic Risk Analysis of Diversion Tunnel Construction Simulation. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 9 (août 2017). (2017):
- Construction Phase Oriented Dynamic Simulation: Taking Rcc Dam Placement Process As an Example. Dans: Journal of Civil Engineering and Management, v. 25, n. 7 (novembre 2019). (2019):
- Evaluation of Compaction Quality Based on SVR with CFA: Case Study on Compaction Quality of Earth-Rock Dam. Dans: Journal of Computing in Civil Engineering, v. 32, n. 3 (mai 2018). (2018):
- Prediction of Dredging Productivity Using a Rock and Soil Classification Model. Dans: Journal of Waterway, Port, Coastal, and Ocean Engineering, v. 141, n. 4 (juillet 2015). (2015):
- Construction Simulation for a Core Rockfill Dam Based on Optimal Construction Stages and Zones: Case Study. Dans: Journal of Computing in Civil Engineering, v. 30, n. 3 (mai 2016). (2016):
- Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. Dans: Journal of Construction Engineering and Management, v. 130, n. 5 (octobre 2004). (2004):
- Automatic control and real-time monitoring system for earth–rock dam material truck watering. Dans: Automation in Construction, v. 30 (mars 2013). (2013):
- Study on real-time construction quality monitoring of storehouse surfaces for RCC dams. Dans: Automation in Construction, v. 49 (janvier 2015). (2015):
- Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data. Dans: Journal of Construction Engineering and Management, v. 138, n. 9 (septembre 2012). (2012):
- Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process. Dans: Journal of Construction Engineering and Management, v. 141, n. 2 (février 2015). (2015):
- Technology and application of real-time compaction quality monitoring for earth-rockfill dam construction in deep narrow valley. Dans: Automation in Construction, v. 90 (juin 2018). (2018):