Li Zhenqiang
- Pretensioned, precast concrete hollow-core units used for interchange bridge project in Honduras. Dans: PCI Journal, v. 55, n. 2 (mars 2010). (2010):
- Design and Construction of a Honduran Replacement Bridge. Dans: PCI Journal, v. 51, n. 4 (juillet 2006). (2006):
- Honduras Industrial Park Ensures Pedestrian Safety With Precast Prestressed Cable-Stayed Bridge. Dans: PCI Journal, v. 49, n. 4 (juillet 2004). (2004):
- Design and Construction of the Texaco Wharf Maritime Port Facility, Puerto Cortés, Honduras. Dans: PCI Journal, v. 47, n. 4 (juillet 2002). (2002):
- Precast Prestressed Bridge for Buffalo Industrial Park. Dans: PCI Journal, v. 45, n. 3 (mai 2000). (2000):
- Design-Construction of Umbrella-Shaped Precast Folded Plate Roofs for Pavilions. Dans: PCI Journal, v. 44, n. 1 (janvier 1999). (1999):
- Design-Construction of Olympic Stadium in Honduras. Dans: PCI Journal, v. 43, n. 1 (janvier 1998). (1998):
- Precast Folded Plate Canopy Beautifies Entrance to Industrial Park. Dans: PCI Journal, v. 37, n. 6 (novembre 1992). (1992):
- Precast Prestressed Concrete Folded Plate Industrial Building System. Dans: PCI Journal, v. 37, n. 2 (mars 1992). (1992):
- Folded Plate Pedestrian Bridge. Dans: PCI Journal, v. 36, n. 2 (mars 1991). (1991):
- Construction of Precast Prestressed Folded Plate Structures in Honduras. Dans: PCI Journal, v. 36, n. 1 (janvier 1991). (1991):