Jielian Zheng
- Quantitative analysis of debonding gaps in concrete-filled steel tubes on the Qinghai-Tibet Plateau under severely harsh conditions. Dans: Engineering Structures, v. 314 (septembre 2024). (2024):
- Innovative Technologies for Construction of the Pingnan Third Bridge. Présenté pendant: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022. (2022):
- Innovations in Design, Construction, and Management of Pingnan Third Bridge—The Largest-Span Arch Bridge in the World. Dans: Structural Engineering International, v. 32, n. 2 (avril 2022). (2022):