- Predicting temporal evacuation travel time in staircases between adjacent floors of super high-rise buildings by artificial neural networks. Dans: Journal of Building Engineering, v. 98 (décembre 2024). (2024):
- BIM-based multi-objective optimization of clash resolution: A NSGA-II approach. Dans: Journal of Building Engineering, v. 89 (juillet 2024). (2024):