Junpeng Zhao
- (2024): Technology Gap Analysis on the BIM-Enabled Design Process of Prefabricated Buildings: An Autoethnographic Study. Dans: Buildings, v. 14, n. 11 (22 octobre 2024).
- Study on working mechanism and mechanical properties of retractable U-shaped steel gangue prevention structure. Dans: Tunnelling and Underground Space Technology, v. 155 (janvier 2025). (2025):
- Study on the thermal performance of a new type of latent heat storage unit (LHSU). Dans: Journal of Building Engineering, v. 64 (avril 2023). (2023):
- Concurrent topology optimization with uniform microstructure for minimizing dynamic response in the time domain. Dans: Computers & Structures, v. 222 (octobre 2019). (2019):
- Topology optimization for minimizing the maximum dynamic response in the time domain using aggregation functional method. Dans: Computers & Structures, v. 190 (1 octobre 2017). (2017):