Xigang Zhang
- Thoughts on the Development of Bridge Technology in China. Dans: Engineering, v. 5, n. 6 (décembre 2019). (2019):
- Research and practice of health monitoring for long-span bridges in the mainland of China. Dans: Smart Structures and Systems, v. 15, n. 3 (mars 2015). (2015):
- Study on live load reduction factors of train for long span multitrack railway suspension bridges. Dans: Structures, v. 32 (août 2021). (2021):
- Global Analysis of the SuTong Cable-stayed Bridge. Dans: Journal of Highway and Transportation Research and Development (English Edition), v. 1, n. 1 (décembre 2006). (2006):
- Aerodynamic Problems of a Super-long Span Cable-stayed Bridge. Présenté pendant: IABSE Symposium: Structures and Extreme Events, Lisbon, Portugal, 14-17 September 2005. (2005):
- Global Analysis of the SuTong Cable-Stayed Bridge. Présenté pendant: IABSE Conference: Role of Structural Engineers towards Reduction of Poverty, New Delhi, India, 19-22 February 2005. (2005):
- Sutong Bridge - The Longest Cable-Stayed Bridge in the World. Dans: Structural Engineering International, v. 18, n. 4 (novembre 2008). (2008):
- (2008): Sutong Bridge-A Cable-stayed Bridge with Main Span of 1088 Meters. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- (2007): Ship Impact Protection System of Sutong Yangtze River Bridge. Présenté pendant: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007.