0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ke, Ruimin / Zeng, Ziqiang / Pu, Ziyuan / Wang, Yinhai (2018): New Framework for Automatic Identification and Quantification of Freeway Bottlenecks Based on Wavelet Analysis. Dans: Journal of Transportation Engineering, Part A: Systems, v. 144, n. 9 (septembre 2018).

    https://doi.org/10.1061/jtepbs.0000168

  2. Xu, Jiuping / Zhao, Siwei / Li, Zongmin / Zeng, Ziqiang (2016): Bilevel Construction Site Layout Optimization Based on Hazardous-Material Transportation. Dans: Journal of Infrastructure Systems, v. 22, n. 3 (septembre 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000303

  3. Zeng, Ziqiang / Xu, Jiuping / Wu, Shiyong / Shen, Manbin (2014): Antithetic Method-Based Particle Swarm Optimization for a Queuing Network Problem with Fuzzy Data in Concrete Transportation Systems. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 10 (octobre 2014).

    https://doi.org/10.1111/mice.12111

  4. Song, Xiaoling / Xu, Jiuping / Shen, Charles / Peña-Mora, Feniosky / Zeng, Ziqiang (2017): A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects. Dans: International Journal of Civil Engineering, v. 15, n. 2 (janvier 2017).

    https://doi.org/10.1007/s40999-016-0107-1

  5. Song, Xiaoling / Zhang, Zhe / Xu, Jiuping / Zeng, Ziqiang / Shen, Charles / Peña-Mora, Feniosky (2018): Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects. Dans: International Journal of Civil Engineering, v. 16, n. 8 (mai 2018).

    https://doi.org/10.1007/s40999-017-0233-4

  6. Feng, Cuiying / Xu, Jiuping / Yang, Xin / Zeng, Ziqiang (2016): Stackelberg-Nash Equilibrium for Integrated Gravelly Soil Excavation-Transportation-Distribution System in a Large-Scale Hydropower Construction Project. Dans: Journal of Computing in Civil Engineering, v. 30, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000585

  7. Xu, Jiuping / Zeng, Ziqiang (2011): Applying Optimal Control Model to Dynamic Equipment Allocation Problem: Case Study of Concrete-Faced Rockfill Dam Construction Project. Dans: Journal of Construction Engineering and Management, v. 137, n. 7 (juillet 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000325

  8. Xu, Jiuping / Meng, Jun / Zeng, Ziqiang / Wu, Shiyong / Shen, Manbin (2013): Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment. Dans: Journal of Construction Engineering and Management, v. 139, n. 2 (février 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000593

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine