- Ground Behavior due to Dewatering Inside a Foundation Pit Considering the Barrier Effect of Preexisting Building Piles on Aquifer Flow. Dans: Journal of Geotechnical and Geoenvironmental Engineering, v. 150, n. 6 (juin 2024). (2024):
- Construction dewatering in a metro station incorporating buttress retaining wall to limit ground settlement: Insights from experimental modelling. Dans: Tunnelling and Underground Space Technology, v. 116 (octobre 2021). (2021):
- Use of cross wall to restrict enclosure movement during dewatering inside a metro pit before soil excavation. Dans: Tunnelling and Underground Space Technology, v. 112 (juin 2021). (2021):