W. C. Zech
- State-of-the-Practice for Liquidated Damages, Incentive/Disincentive, and Road User Cost Provisions on High-Value Transportation Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 2 (mai 2019). (2019):
- Liquidated Damages: Review of Current State of the Practice. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 134, n. 4 (octobre 2008). (2008):
- State of the Practice: Evaluation of Sediment Basin Design, Construction, Maintenance, and Inspection Procedures. Dans: Practice Periodical on Structural Design and Construction, v. 19, n. 2 (mai 2014). (2014):
- Field Evaluation of Silt Fence Tieback Systems at a Highway Construction Site. Dans: Practice Periodical on Structural Design and Construction, v. 14, n. 3 (août 2009). (2009):