Chenyun Yu
- Water control of water-rich deeply buried tunnel: an analytical model of a combined scheme. Dans: Geotechnical and Geological Engineering, v. 41, n. 7 (20 juin 2023). (2023):
- Factors That Influence the Concession Period Length for Tunnel Projects under BOT Contracts. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 1 (janvier 2014). (2014):
- A Coupled Rock-Pipe Hydraulic Model for Predicting Groundwater Pressure on Tunnel Linings with Embedded Drainage Networks. Dans: Geotechnical and Geological Engineering, v. 42, n. 5 (janvier 2024). (2024):