- Evaluating and optimizing performance of public–private partnership projects using copula Bayesian network. Dans: Engineering, Construction and Architectural Management, v. 31, n. 1 (septembre 2022). (2022):
- Study of the Urmia Lake Dispute Using Incorporation of System Dynamics and Graph Model for Conflict Resolution Approaches. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (août 2021). (2021):
- Considering Attitudes in Strategic Negotiation over Brownfield Disputes. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 4 (novembre 2010). (2010):
- Evolving History of Sustainable Project: Exploring Existential Meaning at the Agency Level. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 2 (mai 2021). (2021):
- Attitude-Based Negotiation Methodology for the Management of Construction Disputes. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 3 (juillet 2010). (2010):
- System of Multiple ANNs for Online Planning of Numerous Building Improvements. Dans: Journal of Construction Engineering and Management, v. 134, n. 5 (mai 2008). (2008):
- Optimum compromise among environmental dispute issues using attitude based negotiation. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 2 (février 2011). (2011):