Jing Yin
- Dispatching rule design for tower crane scheduling in prefabricated construction via genetic programming. Dans: Automation in Construction, v. 165 (septembre 2024). (2024):
- (2023): Pricing and Coordination for the Leasing and Recycling of Construction Machinery in a Supply Chain Based on Industrial Internet Platform. Dans: Buildings, v. 13, n. 7 (28 juin 2023).
- (2023): Pricing and Coordinating the Lease-Oriented Closed-Loop Supply Chain for Construction Machinery in the Era of Carbon Tax. Dans: Buildings, v. 13, n. 9 (23 août 2023).
- Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Dans: Engineering, Construction and Architectural Management, v. 31, n. 3 (décembre 2022). (2022):
- On the aerodynamic loads when a high speed train passes under an overhead bridge. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 202 (juillet 2020). (2020):
- Dynamic analysis of the flow fields around single- and double-unit trains. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 188 (mai 2019). (2019):
- Qualitative Description of Swashing Motion States on Mild Beach Slope. Dans: China Ocean Engineering, v. 33, n. 4 (juillet 2019). (2019):
- Fire resistance of axially loaded concrete filled steel tube columns. Dans: Journal of Constructional Steel Research, v. 62, n. 7 (juillet 2006). (2006):
- A hybrid finite-volume and finite difference scheme for depth-integrated non-hydrostatic model. Dans: China Ocean Engineering, v. 31, n. 3 (juin 2017). (2017):