0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Yang, Li-Ren / O'Connor, James T. / Huang, Chung-Fah (2007): Comparison of Technology Utilization and Benefits in Taiwanese and U.S. Industries. Dans: Journal of Management in Engineering (ASCE), v. 23, n. 3 (juillet 2007).

    https://doi.org/10.1061/(asce)0742-597x(2007)23:3(147)

  2. Yang, Li-Ren / Huang, Chung-Fah (2016): Information Platform To Improve Technological Innovation Capabilities: Role of Cloud Platform. Dans: Journal of Civil Engineering and Management, v. 22, n. 7 (juillet 2016).

    https://doi.org/10.3846/13923730.2014.929023

  3. Yang, Li-Ren / Chen, Jieh-Haur / Huang, Chung-Fah (2014): A Comprehensive Framework for Evaluating Key Project Requirements. Dans: Journal of Civil Engineering and Management, v. 19 (janvier 2014).

    https://doi.org/10.3846/13923730.2013.801903

  4. Yang, Li-Ren / Chen, Jieh-Haur / Huang, Chung-Fah (2012): Requirements Definition and Management Practice to Improve Project Outcomes/ Reikalavimų apibrėžimas ir vadyba gerinant projekto rezultatus. Dans: Journal of Civil Engineering and Management, v. 18, n. 1 (février 2012).

    https://doi.org/10.3846/13923730.2012.657340

  5. Yang, Li-Ren / Wu, Kun-Shan / Huang, Chung-Fah (2013): Validation of a model measuring the effect of a project manager's leadership style on project performance. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013).

    https://doi.org/10.1007/s12205-013-1489-0

  6. Yang, Li-Ren / Huang, Chung-Fah (2015): Information technology utilization to improve project team-owner relationship and project performance. Dans: KSCE Journal of Civil Engineering, v. 20, n. 1 (février 2015).

    https://doi.org/10.1007/s12205-015-0147-0

  7. Yang, Li-Ren (2008): Exploring the links between task-level automation usage and project satisfaction. Dans: Automation in Construction, v. 17, n. 4 (mai 2008).

    https://doi.org/10.1016/j.autcon.2007.08.001

  8. Chen, Jieh-Haur / Yang, Li-Ren / Su, Mu-Chun (2009): Comparison of SOM-based optimization and particle swarm optimization for minimizing the construction time of a secant pile wall. Dans: Automation in Construction, v. 18, n. 6 (octobre 2009).

    https://doi.org/10.1016/j.autcon.2009.03.008

  9. Yang, Li-Ren / Chen, Jieh-Haur / Wang, Hsiao-Wen (2012): Assessing impacts of information technology on project success through knowledge management practice. Dans: Automation in Construction, v. 22 (mars 2012).

    https://doi.org/10.1016/j.autcon.2011.06.016

  10. Yang, Li-Ren / O'Connor, James T. / Chen, Jieh-Haur (2007): Assessment of automation and integration technology's impacts on project stakeholder success. Dans: Automation in Construction, v. 16, n. 6 (septembre 2007).

    https://doi.org/10.1016/j.autcon.2006.11.005

  11. Chen, Jieh-Haur / Yang, Li-Ren / Tai, Hsing-Wei (2016): Process reengineering and improvement for building precast production. Dans: Automation in Construction, v. 68 (août 2016).

    https://doi.org/10.1016/j.autcon.2016.05.015

  12. Yang, Li-Ren (2009): Impacts of automation technology on quality of project deliverables in the Taiwanese construction industry. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 3 (mars 2009).

    https://doi.org/10.1139/l08-072

  13. O'Connor, James T. / Yang, Li-Ren (2004): Project Performance versus Use of Technologies at Project and Phase Levels. Dans: Journal of Construction Engineering and Management, v. 130, n. 3 (juin 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(322)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine