T. Yamamoto
- Mechanical Behavior of a Composite Box Bridge Used for 40 Years. Dans: Procedia Engineering, v. 14 ( 2011). (2011):
- Fatigue behaviour of age-hardened Cu-Ni-Si alloy and effect of sporadic discontinuous precipitates on fatigue strength. Dans: Procedia Structural Integrity, v. 7 ( 2017). (2017):
- Expansion of Scope of Application of Mechanical Rebar Anchorage Method Contributing to Productivity Improvement and Performance Evaluation─Taking Plate-Anchored Shear Reinforcing Bars as an Example─. Dans: Concrete Journal (JCI), v. 55, n. 10 ( 2017). (2017):
- 石炭火力産微粒子(フライアッシュ)の利用拡大に向けて (For the Use Expansion of Coal Power Fine Particle, Fly Ash). Dans: Concrete Journal (JCI), v. 52, n. 5 ( 2014). (2014):
- 混合主桁を有する斜張橋 (Cable Stayed Bridge with Composite Main Girder). Dans: Concrete Journal (JCI), v. 52, n. 1 ( 2014). (2014):
- アジアとヨーロッパをつなぐ「ボスポラス海峡横断鉄道トンネル」─100年の耐用年数を保証する強度,耐久性と止水性能を備えた構造物─ (Railway Tunnel Crossing the Bosphorus Strait to Connect Asia and Europe─Structures Provided the Strength, Durability and Waterproofness of 100 Year Service Life─). Dans: Concrete Journal (JCI), v. 52, n. 11 ( 2014). (2014):
- 鋼材腐食を生じたコンクリート構造物の構造性能研究─宮川豊章博士,武若耕司博士らのアプローチ─ (Study on Structural Performance of Concrete Structures with Corroded Reinforcing Steel—Approaches by Dr. Toyoaki Miyagawa and Dr. Koji Takewaka—). Dans: Concrete Journal (JCI), v. 51, n. 9 ( 2013). (2013):
- プレート定着型せん断補強鉄筋 (Plate Anchored Stirrup). Dans: Concrete Journal (JCI), v. 36, n. 9 ( 1998). (1998):
- わが国最大級のPC斜張橋の施工 (Construction of one of the Longest Prestressed Concrete Cable-Stayed Bridge in Japan). Dans: Concrete Journal (JCI), v. 31, n. 5 ( 1993). (1993):
- コンクリート長大アーチ橋の設計・施工技術の現状と将来 (The State of the Art and the Future Prospects on Long-Span Concrete Arch Bridges). Dans: Concrete Journal (JCI), v. 39, n. 3 ( 2001). (2001):
- フライアッシュのポゾラン反応を評価するための新しい促進化学試験法案 (API Method, an Accelerated Estimation Method for Pozzolanic Reactivity of Fly Ash). Dans: Concrete Journal (JCI), v. 46, n. 3 ( 2008). (2008):
- 新素材を用いた吊床版橋 (Design and Construction of Stress-Ribbon Bridge Reinforced with New, Materials). Dans: Concrete Journal (JCI), v. 29, n. 10 ( 1991). (1991):
- 新東名高速道路 佐奈川橋の設計と施工─高強度材料を用いたPRC箱桁ラーメン橋─ (Design and Construction of Sanagawa-bridge on New Tomei Expressway—PRC Rigid Frame Bridge with High Strength Material). Dans: Concrete Journal (JCI), v. 49, n. 7 ( 2011). (2011):
- Evaluation the Structural Soundness after the Earthquake based on the Vibration Monitoring at High-Rise Buildings. Dans: Concrete Journal (JCI), v. 56, n. 1 ( 2018). (2018):
- Performance Based Design and Maintenance Scenario with ASR Control. Dans: Concrete Journal (JCI), v. 55, n. 12 ( 2017). (2017):
- Debonding monitoring of composite repair patches using embedded small-diameter FBG sensors. Dans: Smart Materials and Structures, v. 16, n. 3 (juin 2007). (2007):
- Compensation procedure for half-cell potential measurement. Dans: Construction and Building Materials, v. 11, n. 7-8 ( 1997). (1997):