Aaron Yakel
- Field Application Case Studies and Long-Term Monitoring of Bridges Utilizing the Simple for Dead--Continuous for Live Bridge System. Dans: Engineering Journal, v. 51, n. 3 (septembre 2014). (2014):
- Experimental Investigation, Application and Monitoring of a Simple for Dead Load--Continuous for Live Load Connection for Accelerated Modular Steel Bridge Construction. Dans: Engineering Journal, v. 51, n. 3 (septembre 2014). (2014):
- Development and Experimental Testing of Connections for the Simple for Dead Load--Continuous for Live Load Steel Bridge System. Dans: Engineering Journal, v. 51, n. 2 (juin 2014). (2014):
- Experimental investigation of redundancy of twin steel box-girder bridges under concentrated loads. Dans: Journal of Constructional Steel Research, v. 177 (février 2021). (2021):
- Experimental investigation of a bridge girder made of steel tube filled with concrete. Dans: Journal of Constructional Steel Research, v. 61, n. 3 (mars 2005). (2005):
- Flexible Pile Head in Jointless Bridges: Design Provisions for H-Piles in Cohesive Soils. Dans: Journal of Bridge Engineering (ASCE), v. 21, n. 3 (mars 2016). (2016):
- Deck-pier connection detail for the simple for dead load and continuous for live load bridge system in seismic regions. Dans: Engineering Structures, v. 173 (octobre 2018). (2018):