-
Xu, Jiuping / Li, Ruolan / Shi, Yi / Deng, Yawen (2022): Life cycle assessment-based optimization approaches for sustainable disposal of municipal solid waste. Dans: Sustainable Cities and Society, v. 79 (avril 2022).
https://doi.org/10.1016/j.scs.2021.103665
-
Xu, Jiuping / Liu, Tingting (2021): Optimal Hourly Scheduling for Wind–Hydropower Systems with Integrated Pumped-Storage Technology. Dans: Journal of Energy Engineering, v. 147, n. 3 (juin 2021).
https://doi.org/10.1061/(asce)ey.1943-7897.0000728
-
Shi, Yi / Xu, Jiuping (2021): BIM-based information system for econo-enviro-friendly end-of-life disposal of construction and demolition waste. Dans: Automation in Construction, v. 125 (mai 2021).
https://doi.org/10.1016/j.autcon.2021.103611
-
Xu, Jiuping / Tu, Yan / Lei, Xiao (2014): Applying Multiobjective Bilevel Optimization under Fuzzy Random Environment to Traffic Assignment Problem: Case Study of a Large-Scale Construction Project. Dans: Journal of Infrastructure Systems, v. 20, n. 3 (septembre 2014).
https://doi.org/10.1061/(asce)is.1943-555x.0000147
-
Xu, Jiuping / Zhao, Siwei / Li, Zongmin / Zeng, Ziqiang (2016): Bilevel Construction Site Layout Optimization Based on Hazardous-Material Transportation. Dans: Journal of Infrastructure Systems, v. 22, n. 3 (septembre 2016).
https://doi.org/10.1061/(asce)is.1943-555x.0000303
-
Tu, Yan / Zhou, Xiaoyang / Gang, Jun / Xu, Jiuping / Shen, Wenjing / Lev, Benjamin (2017): Hierarchical Supplier Selection Optimization with Multiple Items in Large-Scale Construction Projects. Dans: Journal of Infrastructure Systems, v. 23, n. 3 (septembre 2017).
https://doi.org/10.1061/(asce)is.1943-555x.0000356
-
Xu, Jiuping / Deng, Yawen / Shi, Yi / Huang, Yidan (2020): A bi-level optimization approach for sustainable development and carbon emissions reduction towards construction materials industry: a case study from China. Dans: Sustainable Cities and Society, v. 53 (février 2020).
https://doi.org/10.1016/j.scs.2019.101828
-
Xu, Jiuping / Zhong, Lin / Yao, Liming / Wu, Zhibin (2018): An interval type-2 fuzzy analysis towards electric vehicle charging station allocation from a sustainable perspective. Dans: Sustainable Cities and Society, v. 40 (juillet 2018).
https://doi.org/10.1016/j.scs.2017.12.010
-
Dong, Rentao / Xu, Jiuping (2015): Impact of differentiated local subsidy policies on the development of distributed energy system. Dans: Energy and Buildings, v. 101 (août 2015).
https://doi.org/10.1016/j.enbuild.2015.05.001
-
Zeng, Ziqiang / Xu, Jiuping / Wu, Shiyong / Shen, Manbin (2014): Antithetic Method-Based Particle Swarm Optimization for a Queuing Network Problem with Fuzzy Data in Concrete Transportation Systems. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 10 (octobre 2014).
https://doi.org/10.1111/mice.12111
-
Gan, Lu / Xu, Jiuping (2015): Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 3 (mai 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000243
-
Song, Xiaoling / Peña-Mora, Feniosky / Shen, Charles / Zhang, Zhe / Xu, Jiuping (2019): Modelling the effect of multi-stakeholder interactions on construction site layout planning using agent-based decentralized optimization. Dans: Automation in Construction, v. 107 (novembre 2019).
https://doi.org/10.1016/j.autcon.2019.102927
-
Xu, Jiuping / Liu, Qiurui / Lei, Xiao (2016): A Fuzzy Multi-objective Model and Application for the Discrete Dynamic Temporary Facilities Location Planning Problem. Dans: Journal of Civil Engineering and Management, v. 22, n. 3 (mars 2016).
https://doi.org/10.3846/13923730.2014.897974
-
Song, Xiaoling / Xu, Jiuping / Shen, Charles / Peña-Mora, Feniosky / Zeng, Ziqiang (2017): A Decision Making System for Construction Temporary Facilities Layout Planning in Large-Scale Construction Projects. Dans: International Journal of Civil Engineering, v. 15, n. 2 (janvier 2017).
https://doi.org/10.1007/s40999-016-0107-1
-
Song, Xiaoling / Zhang, Zhe / Xu, Jiuping / Zeng, Ziqiang / Shen, Charles / Peña-Mora, Feniosky (2018): Bi-stakeholder Conflict Resolution-Based Layout of Construction Temporary Facilities in Large-Scale Construction Projects. Dans: International Journal of Civil Engineering, v. 16, n. 8 (mai 2018).
https://doi.org/10.1007/s40999-017-0233-4
-
Xu, Jiuping / Liu, Qiurui / Yang, Zhonghua (2017): A Hybrid Optimal Model for Daily Reservoir Regulation Problem Under Fuzzy Random Environment. Dans: International Journal of Civil Engineering, v. 15, n. 1 (juin 2017).
https://doi.org/10.1007/s40999-016-0106-2
-
Song, Xiaoling / Zhong, Lin / Zhang, Zhe / Xu, Jiuping / Shen, Charles / Peña-Mora, Feniosky (2018): Multistakeholder Conflict Minimization–Based Layout Planning of Construction Temporary Facilities. Dans: Journal of Computing in Civil Engineering, v. 32, n. 2 (mars 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000725
-
Yan, Fang / Xu, Jiuping / Han, Bernard T. (2015): Material transportation problems in construction projects under an uncertain environment. Dans: KSCE Journal of Civil Engineering, v. 19, n. 7 (février 2015).
https://doi.org/10.1007/s12205-015-0204-8
-
Zhang, Zhe / Xu, Jiuping (2014): Applying rough random MODM model to resource-constrained project scheduling problem: A case study of Pubugou Hydropower Project in China. Dans: KSCE Journal of Civil Engineering, v. 18, n. 5 (mai 2014).
https://doi.org/10.1007/s12205-014-0426-1
-
Sun, Caiyu / Xu, Jiuping (2011): Estimation of Time for Wenchuan Earthquake Reconstruction in China. Dans: Journal of Construction Engineering and Management, v. 137, n. 3 (mars 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000277
-
Xu, Jiuping / Zeng, Ziqiang (2011): Applying Optimal Control Model to Dynamic Equipment Allocation Problem: Case Study of Concrete-Faced Rockfill Dam Construction Project. Dans: Journal of Construction Engineering and Management, v. 137, n. 7 (juillet 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000325
-
Song, Xiaoling / Xu, Jiuping / Shen, Charles / Peña-Mora, Feniosky (2018): Conflict resolution-motivated strategy towards integrated construction site layout and material logistics planning: A bi-stakeholder perspective. Dans: Automation in Construction, v. 87 (mars 2018).
https://doi.org/10.1016/j.autcon.2017.12.018
-
Xu, Jiuping / Li, Zongmin (2012): Multi-Objective Dynamic Construction Site Layout Planning in Fuzzy Random Environment. Dans: Automation in Construction, v. 27 (novembre 2012).
https://doi.org/10.1016/j.autcon.2012.05.017
-
Li, Zongmin / Shen, Wenjing / Xu, Jiuping / Lev, Benjamin (2015): Bilevel and multi-objective dynamic construction site layout and security planning. Dans: Automation in Construction, v. 57 (septembre 2015).
https://doi.org/10.1016/j.autcon.2015.04.011
-
Song, Xiaoling / Xu, Jiuping / Shen, Charles / Peña-Mora, Feniosky (2016): Conflicts resolution based construction temporary facilities layout planning in large-scale construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 9 (septembre 2016).
https://doi.org/10.1139/cjce-2015-0144
-
Xu, Jiuping / Yin, Yujie / Tao, Zhimiao (2013): Rough approximation-based random model for quarry location and stone materials transportation problem. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 40, n. 9 (septembre 2013).
https://doi.org/10.1139/cjce-2012-0212
-
Xu, Jiuping / Zhao, Siwei (2017): Noncooperative Game-Based Equilibrium Strategy to Address the Conflict between a Construction Company and Selected Suppliers. Dans: Journal of Construction Engineering and Management, v. 143, n. 8 (août 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001329
-
Xu, Jiuping / Meng, Jun / Zeng, Ziqiang / Wu, Shiyong / Shen, Manbin (2013): Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment. Dans: Journal of Construction Engineering and Management, v. 139, n. 2 (février 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000593
-
Xu, Jiuping / Shi, Yi / Zhao, Siwei (2019): Reverse Logistics Network-Based Multiperiod Optimization for Construction and Demolition Waste Disposal. Dans: Journal of Construction Engineering and Management, v. 145, n. 2 (février 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001592
-
Ma, Yanfang / Xu, Jiuping (2014): novel multiple decision-maker model for resource-constrained project scheduling problems. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 6 (juin 2014).
https://doi.org/10.1139/cjce-2013-0232