Wang Xingxing
- Seismic fragility of cold-formed steel structures considering the performance degradation of hold-downs. Dans: Structures, v. 60 (février 2024). (2024):
- Shear behavior of gypsum boards sheathed CFS framed shear walls with enlarged edge members. Dans: Structures, v. 58 (décembre 2023). (2023):
- Quasi-static loading procedure of CFS framed shear walls considering ground motion duration. Dans: Structures, v. 56 (octobre 2023). (2023):
- Experimental research and theoretical analysis of novel polygon‐key assembly connections. Dans: Structural Concrete, v. 24, n. 5 (octobre 2023). (2023):
- Seismic behavior of a precast RC frame–shear wall structure using full/half grout sleeve connections. Dans: Engineering Structures, v. 280 (avril 2023). (2023):
- Seismic damage model for gypsum board-to-CFS stud screw connections considering ground motion duration. Dans: Engineering Structures, v. 280 (avril 2023). (2023):
- Synergistic shear behaviour of cold-formed steel shear walls and reinforced edge struts. Dans: Journal of Constructional Steel Research, v. 184 (septembre 2021). (2021):
- Cyclic performance of K-braced cold-formed steel shear walls with concrete-filled steel- tubular struts. Dans: Journal of Constructional Steel Research, v. 173 (octobre 2020). (2020):
- Experimental investigation on the structural performance of a reinforced cold-formed steel beam–column joint. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 12 (décembre 2018). (2018):