Zhengda Wu
- The performance evaluation of extracted asphalt binder from dry process produced rubber modified asphalt mixture. Dans: Construction and Building Materials, v. 401 (octobre 2023). (2023):
- Laboratory investigation on performance of waste-oil cutback asphalt as prime coat on cement stabilized macadam base. Dans: Construction and Building Materials, v. 365 (février 2023). (2023):
- The performance evaluation of high content bio-asphalt modified with polyphosphoric acid. Dans: Construction and Building Materials, v. 361 (décembre 2022). (2022):
- Investigation on strength characteristics of bio-asphalt mixtures based on the time–temperature equivalence principle. Dans: Construction and Building Materials, v. 309 (novembre 2021). (2021):