Changzhi Wu
- Excitation Current Analysis of a Hydropower Station Model Considering Complex Water Diversion Pipes. Dans: Journal of Energy Engineering, v. 143, n. 5 (octobre 2017). (2017):
- Case Study of Selecting Decision-Making Schemes in Large-Scale Infrastructure Projects. Dans: Journal of Infrastructure Systems, v. 23, n. 4 (décembre 2017). (2017):
- Interorganizational Diffusion of Prefabricated Construction Technology: Two-Stage Evolution Framework. Dans: Journal of Construction Engineering and Management, v. 146, n. 9 (septembre 2020). (2020):
- Construction project scheduling under workspace interference. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 35, n. 9 (février 2020). (2020):
- Space-Time Repetitive Project Scheduling Considering Location and Congestion. Dans: Journal of Computing in Civil Engineering, v. 32, n. 3 (mai 2018). (2018):
- Discrete Firefly Algorithm for Scaffolding Construction Scheduling. Dans: Journal of Computing in Civil Engineering, v. 31, n. 3 (mai 2017). (2017):
- RFID-Aided Tracking System to Improve Work Efficiency of Scaffold Supplier: Stock Management in Australasian Supply Chain. Dans: Journal of Construction Engineering and Management, v. 144, n. 2 (février 2018). (2018):
- Joint-Venture Contractor Selection Using Competitive and Collaborative Criteria with Uncertainty. Dans: Journal of Construction Engineering and Management, v. 145, n. 2 (février 2019). (2019):