Baosheng Wu
- Case Study: Delayed Sedimentation Response to Inflow and Operations at Sanmenxia Dam. Dans: Journal of Hydraulic Engineering, v. 133, n. 5 (mai 2007). (2007):
- Environmental Impacts of High Water Turbidity of the Niulan River to Dianchi Lake Water Diversion Project. Dans: Journal of Environmental Engineering (ASCE), v. 146, n. 1 (janvier 2020). (2020):