0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

James M. W. Wong

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ng, S. Thomas / Li, Terry H. Y. / Wong, James M. W. (2012): Rethinking public participation in infrastructure projects. Dans: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 165, n. 2 (juin 2012).

    https://doi.org/10.1680/muen.11.00027

  2. Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. (2011): Construction manpower demand forecasting. A comparative study of univariate time series, multiple regression and econometric modelling techniques. Dans: Engineering, Construction and Architectural Management, v. 18, n. 1 (janvier 2011).

    https://doi.org/10.1108/09699981111098667

  3. Chan, Daniel W. M. / Lam, Patrick T. I. / Chan, Albert P. C. / Wong, James M. W. (2011): Guaranteed maximum price (GMP) contracts in practice. A case study of a private office development project in Hong Kong. Dans: Engineering, Construction and Architectural Management, v. 18, n. 2 (mars 2011).

    https://doi.org/10.1108/09699981111111157

  4. Thomas Ng, S. / Wong, James M. W. / Skitmore, Martin (2013): Challenges facing carbon dioxide labelling of construction materials. Dans: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 166, n. 1 (février 2013).

    https://doi.org/10.1680/ensu.11.00028

  5. Thomas Ng, S. / Wong, James M. W. / Skitmore, Steven / Veronika, Alin (2012): Carbon dioxide reduction in the building life cycle: a critical review. Dans: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 165, n. 4 (décembre 2012).

    https://doi.org/10.1680/ensu.11.00005

  6. Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. (2007): Forecasting construction manpower demand: A vector error correction model. Dans: Building and Environment, v. 42, n. 8 (août 2007).

    https://doi.org/10.1016/j.buildenv.2006.07.024

  7. Chan, Daniel W. M. / Chan, Albert P. C. / Lam, Patrick T. I. / Wong, James M. W. (2010): Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction. Dans: Journal of Construction Engineering and Management, v. 136, n. 5 (mai 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000153

  8. Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. (2010): Modeling Construction Occupational Demand: Case of Hong Kong. Dans: Journal of Construction Engineering and Management, v. 136, n. 9 (septembre 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000205

  9. Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. (2008): Modeling and Forecasting Construction Labor Demand: Multivariate Analysis. Dans: Journal of Construction Engineering and Management, v. 134, n. 9 (septembre 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:9(664)

  10. Thomas Ng, S. / Fan, Ryan Y. C. / Wong, James M. W. (2011): An econometric model for forecasting private construction investment in Hong Kong. Dans: Construction Management and Economics, v. 29, n. 5 (mai 2011).

    https://doi.org/10.1080/01446193.2011.570356

  11. Wong, James M. W. / Chiang, Y. H. / Ng, Thomas S. (2008): Construction and economic development: the case of Hong Kong. Dans: Construction Management and Economics, v. 26, n. 8 (août 2008).

    https://doi.org/10.1080/01446190802189927

  12. Thomas Ng, S. / Fan, Ryan Y. C. / Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. / Lam, Patrick T. I. / Kumaraswamy, Mohan (2009): Coping with structural change in construction: experiences gained from advanced economies. Dans: Construction Management and Economics, v. 27, n. 2 (février 2009).

    https://doi.org/10.1080/01446190802699040

  13. Wong, James M. W. / Thomas Ng, S. (2010): Forecasting construction tender price index in Hong Kong using vector error correction model. Dans: Construction Management and Economics, v. 28, n. 12 (décembre 2010).

    https://doi.org/10.1080/01446193.2010.487536

  14. Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. (2005): Time series forecasts of the construction labour market in Hong Kong: the Box‐Jenkins approach. Dans: Construction Management and Economics, v. 23, n. 9 (novembre 2005).

    https://doi.org/10.1080/01446190500204911

  15. Fan, Ryan Y. C. / Thomas Ng, S. / Wong, James M. W. (2010): Reliability of the Box–Jenkins model for forecasting construction demand covering times of economic austerity. Dans: Construction Management and Economics, v. 28, n. 3 (mars 2010).

    https://doi.org/10.1080/01446190903369899

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine