C. H. Wong
- (2021): Potential and limitation of AI system in building services and control management system. Dans: IOP Conference Series: Earth and Environmental Science, v. 881, n. 1 (1 novembre 2021).
- Using multivariate techniques for developing contractor classification models. Dans: Engineering, Construction and Architectural Management, v. 10, n. 2 (avril 2003). (2003):
- Finite-Difference Solution of a Both-End-Fixed Orthotropic Composite Beam under Uniformly Distributed Loading Using Displacement Potential Function Formulation. Dans: Journal of Engineering Mechanics (ASCE), v. 137, n. 4 (avril 2011). (2011):
- Characteristics of flows over an asymmetrically grooved circular cylinder in the transitional regimes. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 69-71 (juillet 1997). (1997):