S. C. Wirasinghe
- New Large Aircraft Gate Requirement for Shared Space and Stage Construction. Dans: Journal of Transportation Engineering, v. 130, n. 2 (mars 2004). (2004):
- Sizing the Baggage Claim Area for the New Large Aircraft. Dans: Journal of Transportation Engineering, v. 130, n. 3 (mai 2004). (2004):
- Analysis of Level of Service at Airport Departure Lounges: User Perception Approach. Dans: Journal of Transportation Engineering, v. 134, n. 2 (février 2008). (2008):
- Optimum Geometries for Pier‐Type Airport Terminals. Dans: Journal of Transportation Engineering, v. 118, n. 2 (mars 1992). (1992):
- Public transportation and sustainability: A review. Dans: KSCE Journal of Civil Engineering, v. 20, n. 3 (mars 2016). (2016):
- Decision analysis for a tsunami detection system – case study: Sri Lanka. Dans: Civil Engineering and Environmental Systems, v. 28, n. 4 (décembre 2011). (2011):
- Planning and modelling for mitigation of tsunami impacts. Dans: Civil Engineering and Environmental Systems, v. 26, n. 2 (juin 2009). (2009):
- Updating of parameters in aggregate total demand models. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 19, n. 2 (avril 1992). (1992):
- Transferability of aggregate intercity total demand models. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 2 (avril 1995). (1995):