Jeffrey West
- Discrete Shear Connection for a Portable Composite Bridge. Dans: Transportation Research Record: Journal of the Transportation Research Board, v. 2313, n. 1 (janvier 2012). (2012):
- Bond behavior of cleaned corroded rebar repaired by partial depth repair. Dans: Structures, v. 27 (octobre 2020). (2020):
- Automated Model-Based Finding of 3D Objects in Cluttered Construction Point Cloud Models. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 11 (octobre 2017). (2017):
- CFRP grid embedded in mortar for strengthening of shear-critical RC beams. Dans: Magazine of Concrete Research, v. 71, n. 14 (juillet 2019). (2019):
- Optimum Assembly Planning for Modular Construction Components. Dans: Journal of Computing in Civil Engineering, v. 31, n. 1 (janvier 2017). (2017):
- Parallel Systems and Structural Frames Realignment Planning and Actuation Strategy. Dans: Journal of Computing in Civil Engineering, v. 30, n. 4 (juillet 2016). (2016):
- Automatic Realignment of Defective Assemblies Using an Inverse Kinematics Analogy. Dans: Journal of Computing in Civil Engineering, v. 30, n. 2 (mars 2016). (2016):
- Fatigue of reinforced concrete beams strengthened with externally post-tensioned CFRP tendons. Dans: Construction and Building Materials, v. 29 (avril 2012). (2012):
- Managing risk in modular construction using dimensional and geometric tolerance strategies. Dans: Automation in Construction, v. 83 (novembre 2017). (2017):
- Automated assembly discrepancy feedback using 3D imaging and forward kinematics. Dans: Automation in Construction, v. 56 (août 2015). (2015):
- Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds. Dans: Automation in Construction, v. 75 (mars 2017). (2017):