0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Osman, Abdul Manaan / Liu, Yisheng / Wang, Zhaojing (2023): Influence of Organizational Culture on Construction Firms’ Performance: The Mediating Roles of Innovation and Marketing Capabilities. Dans: Buildings, v. 13, n. 2 (14 février 2023).

    https://doi.org/10.3390/buildings13020308

  2. Wang, Zhaojing / Yu, Yi / Feeley, Cecilia / Herrick, Samantha / Hu, Hao / Gong, Jie (2022): A route optimization model based on building semantics, human factors, and user constraints to enable personalized travel in complex public facilities. Dans: Automation in Construction, v. 133 (janvier 2022).

    https://doi.org/10.1016/j.autcon.2021.103984

  3. Wang, Zhaojing / Liu, Yisheng / Hu, Hao / Dai, Lei (2021): Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment. Dans: Journal of Construction Engineering and Management, v. 147, n. 4 (avril 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0001976

  4. Wang, Zhaojing / Hu, Hao / Guo, Mengyang / Gong, Jie (2019): Optimization of Temporary Debris Management Site Selection and Site Service Regions for Enhancing Postdisaster Debris Removal Operations. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 34, n. 3 (février 2019).

    https://doi.org/10.1111/mice.12410

  5. Wang, Zhaojing / Hu, Hao / Zhou, Wei (2017): RFID Enabled Knowledge-Based Precast Construction Supply Chain. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 6 (mai 2017).

    https://doi.org/10.1111/mice.12254

  6. Wang, Zhaojing / Wang, Tengyu / Hu, Hao / Gong, Jie / Ren, Xu / Xiao, Qiying (2020): Blockchain-based framework for improving supply chain traceability and information sharing in precast construction. Dans: Automation in Construction, v. 111 (mars 2020).

    https://doi.org/10.1016/j.autcon.2019.103063

  7. Wang, Zhaojing / Hu, Hao (2017): Improved Precast Production–Scheduling Model Considering the Whole Supply Chain. Dans: Journal of Computing in Civil Engineering, v. 31, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000667

  8. Wang, Zhaojing / Hu, Hao / Gong, Jie (2018): Modeling Worker Competence to Advance Precast Production Scheduling Optimization. Dans: Journal of Construction Engineering and Management, v. 144, n. 11 (novembre 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001556

  9. Wang, Zhaojing / Hu, Hao / Gong, Jie (2018): Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components. Dans: Automation in Construction, v. 86 (février 2018).

    https://doi.org/10.1016/j.autcon.2017.10.026

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine