Xiuqin Wang
- Optimal equity structure of PPP projects when private-sector shareholders’ “investor-contractor” dual roles is considered. Dans: Construction Management and Economics, v. 41, n. 11-12 (juin 2023). (2023):
- A chance constrained programming method to determine optimal capital structure for privatized infrastructure. Dans: Construction Management and Economics, v. 39, n. 7 (juin 2021). (2021):
- The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: balancing public and private benefits. Dans: Construction Management and Economics, v. 36, n. 11 (avril 2018). (2018):
- A method to evaluate credit risk for banks under PPP project finance. Dans: Engineering, Construction and Architectural Management, v. 27, n. 2 ( 2020). (2020):
- Enhancing Financing Efficiency of International PPP Projects: A Case Study of Multi-National Gas Pipeline Project. Dans: International Journal of Architecture Engineering and Construction, v. 5, n. 3 (septembre 2016). (2016):