Huxiang Wang
- Study on Progressive Collapse Mechanism of RC Frame Structures Corroded by Chloride. Dans: Case Studies in Construction Materials, v. 22 (juillet 2025). (2025):
- Improved BPNN models based on different algorithms to predict the flexural capacity of corroded RC beams. Dans: Structures, v. 71 (janvier 2025). (2025):
- Shaking table test on seismic response of a planar irregular structure with differential settlements of foundation. Dans: Structures, v. 46 (décembre 2022). (2022):