Ching-Hwang Wang
- Re: Influence of Rate Stability on Project Cost Simulation. Influence of rate stability on project cost simulation. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 23, n. 1 (décembre 2007). (2007):
- PCM in Taiwan: A Diagnosis Knowledge-Base in PCM Plan/Design Phase. Dans: Journal of Computing in Civil Engineering, v. 21, n. 2 (mars 2007). (2007):
- A fuzzy DEA–Neural approach to measuring design service performance in PCM projects. Dans: Automation in Construction, v. 18, n. 5 (août 2009). (2009):
- A new interactive model for improving the learning performance of back propagation neural network. Dans: Automation in Construction, v. 16, n. 6 (septembre 2007). (2007):
- Controlling activity interval times in LOB scheduling. Dans: Construction Management and Economics, v. 16, n. 1 (janvier 1998). (1998):
- Model for forecasting construction cost indices in Taiwan. Dans: Construction Management and Economics, v. 16, n. 2 (mars 1998). (1998):
- Hierarchical indices for measuring the effectiveness of construction automation implementation. Dans: Construction Management and Economics, v. 16, n. 3 (mai 1998). (1998):