- Influences of water filling timing on the deformation mechanism of crushed gangue in goaf. Dans: Case Studies in Construction Materials, v. 20 (juillet 2024). (2024):
- Failure law of floor during strip mining backfill with paste-tailings over confined aquifer: A case study in China mine. Dans: Case Studies in Construction Materials, v. 20 (juillet 2024). (2024):
- Flexural behavior of wet panel-to-panel groove-and-tongue joints provided with lapped U-bars. Dans: Engineering Structures, v. 299 (janvier 2024). (2024):
- Stability Evaluation of mined-out Area and Borehole Grouting Treatment-a case study in China. Dans: Case Studies in Construction Materials, v. 19 (décembre 2023). (2023):
- Experimental Investigation on the Influence of Water Injection Timing on the Deformation of Loose Rock Blocks. Dans: Advances in Civil Engineering, v. 2023 (février 2023). (2023):
- Ground Disturbance of Different Building Locations in Old Goaf Area: a Case Study in China. Dans: Geotechnical and Geological Engineering, v. 37, n. 5 (7 mai 2019). (2019):
- (2019): Study on Filling Material Ratio and Filling Effect: Taking Coarse Fly Ash and Coal Gangue as the Main Filling Component. Dans: Advances in Civil Engineering, v. 2019 ( 2019).