- Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring. Dans: Journal of Construction Engineering and Management, v. 147, n. 9 (septembre 2021). (2021):
- Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring. Dans: Journal of Construction Engineering and Management, v. 146, n. 3 (mars 2020). (2020):