- The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Dans: Construction Management and Economics, v. 42, n. 10 (juin 2024). (2024):
- Value integration in multi-functional urban projects: a value driven perspective on sustainability transitions. Dans: Construction Management and Economics, v. 42, n. 2 (octobre 2023). (2023):
- Collaboration and innovation beyond project boundaries: exploring the potential of an ecosystem perspective in the infrastructure sector. Dans: Construction Management and Economics, v. 41, n. 6 (janvier 2023). (2023):
- A systemic perspective on transition barriers to a circular infrastructure sector. Dans: Construction Management and Economics, v. 41, n. 1 (novembre 2022). (2022):
- Procuring architectural services: sensemaking in a legal context. Dans: Construction Management and Economics, v. 30, n. 9 (septembre 2012). (2012):
- Looking out to look in: inspiration from social sciences for construction management research. Dans: Construction Management and Economics, v. 37, n. 1 (juillet 2018). (2018):
- Taking on a wider view: public value interests of construction clients in a changing construction industry. Dans: Construction Management and Economics, v. 37, n. 5 (octobre 2018). (2018):
- Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Dans: Construction Management and Economics, v. 39, n. 2 (octobre 2020). (2020):
- Dealing with Contract Variations in PPPs: Social Mechanisms and Contract Management in Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 145, n. 11 (novembre 2019). (2019):
- BIM in the operations stage: bottlenecks and implications for owners. Dans: Built Environment Project and Asset Management, v. 5, n. 3 (juillet 2015). (2015):
- Trade-offs in the value capture of architectural firms: the significance of professional value. Dans: Construction Management and Economics, v. 34, n. 1 (janvier 2015). (2015):
- Flexibility in PPP contracts – Dealing with potential change in the pre-contract phase of a construction project. Dans: Construction Management and Economics, v. 35, n. 4 (octobre 2016). (2016):