0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Sindhu Pradeep, Megha / Reja, Varun Kumar / Varghese, Koshy (2024): ConXR: A Comparative Participatory Platform for Construction Progress Monitoring. Dans: Journal of The Institution of Engineers (India): Series A, v. 105, n. 2 (avril 2024).

    https://doi.org/10.1007/s40030-024-00799-0

  2. Reja, Varun Kumar / Sindhu Pradeep, Megha / Varghese, Koshy (2024): Digital Twins for Construction Project Management (DT-CPM): Applications and Future Research Directions. Dans: Journal of The Institution of Engineers (India): Series A, v. 105, n. 3 (juillet 2024).

    https://doi.org/10.1007/s40030-024-00810-8

  3. Reja, Varun Kumar / Goyal, Shreya / Varghese, Koshy / Ravindran, Balaraman / Ha, Quang Phuc (2024): Hybrid self-supervised learning-based architecture for construction progress monitoring. Dans: Automation in Construction, v. 158 (février 2024).

    https://doi.org/10.1016/j.autcon.2023.105225

  4. Srinath, Purushothaman / Varghese, Koshy (2023): Identifying and Analysing the Root Causes of Quality Non-Conformance in Construction Project Baseline Schedules. Dans: Journal of The Institution of Engineers (India): Series A, v. 104, n. 2 (mars 2023).

    https://doi.org/10.1007/s40030-023-00713-0

  5. Sahadevan, Vijayalaxmi / Varghese, Koshy (2022): A Framework to Identify Stakeholder Values for Building Layout Design. Dans: Journal of Architectural Engineering (ASCE), v. 28, n. 3 (septembre 2022).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000549

  6. Reja, Varun Kumar / Varghese, Koshy / Ha, Quang Phuc (2022): Computer vision-based construction progress monitoring. Dans: Automation in Construction, v. 138 (juin 2022).

    https://doi.org/10.1016/j.autcon.2022.104245

  7. Mani, Monto / Varghese, Koshy / Ganesh, L. S. (2005): Integrated Model Framework to Simulate Sustainability of Human Settlements. Dans: Journal of Urban Planning and Development, v. 131, n. 3 (septembre 2005).

    https://doi.org/10.1061/(asce)0733-9488(2005)131:3(147)

  8. Jacob, Jeevan / Varghese, Koshy (2018): A framework for ad hoc information management for the building design process. Dans: Engineering, Construction and Architectural Management, v. 25, n. 8 (septembre 2018).

    https://doi.org/10.1108/ecam-06-2017-0097

  9. Joshua, Liju / Varghese, Koshy (2013): Selection of Accelerometer Location on Bricklayers Using Decision Trees. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 28, n. 5 (février 2013).

    https://doi.org/10.1111/mice.12002

  10. Loganathan, Santhosh / Srinath, Purushothaman / Kumaraswamy, Mohan / Kalidindi, Satyanarayana / Varghese, Koshy (2017): Identifying and Addressing Critical Issues in the Indian Construction Industry: Perspectives of Large Building Construction Clients. Dans: Journal of Construction in Developing Countries, v. 22, n. 1 ( 2017).

    https://doi.org/10.21315/jcdc2017.22.supp1.7

  11. Ummer, Naseef / Maheswari, Uma / Matsagar, Vasant A. / Varghese, Koshy (2014): Factors Influencing Design Iteration with a Focus on Project Duration. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 1 (janvier 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000175

  12. Senthilkumar, Venkatachalam / Varghese, Koshy (2013): Case Study–Based Testing of Design Interface Management System. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 3 (juillet 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000150

  13. Persad, Khali R. / O'Connor, J. T. / Varghese, Koshy (1995): Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities. Dans: Journal of Management in Engineering (ASCE), v. 11, n. 3 (mai 1995).

    https://doi.org/10.1061/(asce)0742-597x(1995)11:3(41)

  14. Senthilkumar, Venkatachalam / Varghese, Koshy (2009): Structured Methodology to Formulate Drawing Dependency Structure Matrix for Construction Design. Dans: Architectural Engineering and Design Management, v. 5, n. 4 (janvier 2009).

    https://doi.org/10.3763/aedm.2008.0103

  15. Sivakumar, PL. / Varghese, Koshy / Babu, N. Ramesh (2003): Automated Path Planning of Cooperative Crane Lifts Using Heuristic Search. Dans: Journal of Computing in Civil Engineering, v. 17, n. 3 (juillet 2003).

    https://doi.org/10.1061/(asce)0887-3801(2003)17:3(197)

  16. Ali, M. S. Ajmal Deen / Babu, N. Ramesh / Varghese, Koshy (2005): Collision Free Path Planning of Cooperative Crane Manipulators Using Genetic Algorithm. Dans: Journal of Computing in Civil Engineering, v. 19, n. 2 (avril 2005).

    https://doi.org/10.1061/(asce)0887-3801(2005)19:2(182)

  17. Joshua, Liju / Varghese, Koshy (2011): Accelerometer-Based Activity Recognition in Construction. Dans: Journal of Computing in Civil Engineering, v. 25, n. 5 (septembre 2011).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000097

  18. Uma Maheswari, J. / Varghese, Koshy / Sridharan, T. (2006): Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 5 (mai 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:5(482)

  19. Varghese, Koshy / Dharwadkar, Parmanand / Wolfhope, John / O'Connor, James T. (1997): A Heavy Lift Planning System for Crane Lifts. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 1 (janvier 1997).

    https://doi.org/10.1111/0885-9507.00044

  20. Shanmugam, Sangeetha P. / Parvatham, Ravikanth / Varghese, Koshy (2002): Geographic Information System for Coordination of Fast-Track Projects. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 4 (juillet 2002).

    https://doi.org/10.1111/1467-8667.00277

  21. Reddy, H. Raghunatha / Varghese, Koshy (2002): Automated Path Planning for Mobile Crane Lifts. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 6 (novembre 2002).

    https://doi.org/10.1111/0885-9507.00005

  22. Oka, Shriram / Garg, Akash / Varghese, Koshy (2012): Vectorization of contour lines from scanned topographic maps. Dans: Automation in Construction, v. 22 (mars 2012).

    https://doi.org/10.1016/j.autcon.2011.06.017

  23. Senthilkumar, Venkatachalam / Varghese, Koshy / Chandran, Ajai (2010): A web-based system for design interface management of construction projects. Dans: Automation in Construction, v. 19, n. 2 (mars 2010).

    https://doi.org/10.1016/j.autcon.2009.10.007

  24. Soman, Ranjith K. / Raphael, Benny / Varghese, Koshy (2017): A System Identification Methodology to monitor construction activities using structural responses. Dans: Automation in Construction, v. 75 (mars 2017).

    https://doi.org/10.1016/j.autcon.2016.12.006

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine