- (2023): A Memetic Algorithm for the Solution of the Resource Leveling Problem. Dans: Buildings, v. 13, n. 11 (26 octobre 2023).
- (2023): Bootstrap Aggregated Case-Based Reasoning Method for Conceptual Cost Estimation. Dans: Buildings, v. 13, n. 3 (26 février 2023).
- Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem. Dans: Journal of Computing in Civil Engineering, v. 29, n. 5 (septembre 2015). (2015):
- Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Dans: Journal of Construction Engineering and Management, v. 142, n. 3 (mars 2016). (2016):
- Geographic information system–based visualization system for planning and monitoring of repetitive construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (novembre 2008). (2008):