Robert Uschan
- Koralmtunnel underground emergency stop - Geotechnical design and construction. Dans: Geomechanics and Tunnelling, v. 10, n. 6 (novembre 2017). (2017):
- The logistical challenges of the long tunnel drives on contract KAT 2 / Die logistischen Herausforderungen der langen Tunnelvortriebe des Bauloses KAT 2. Dans: Geomechanics and Tunnelling, v. 6, n. 6 ( 2013). (2013):
- Construction shaft of the Koralm Tunnel lot KAT 2 - a challenge in structural analysis, geotechnics and logistics / Der Bauschacht des Koralmtunnels Baulos KAT 2 - eine statische, geotechnische und logistische Herausforderung. Dans: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013). (2013):