- Instance-Based Clustering of Road Markings with Wear and Occlusion from Mobile Lidar Data. Dans: Journal of Computing in Civil Engineering, v. 38, n. 4 (juillet 2024). (2024):
- Computing in AEC Education: Hindsight, Insight, and Foresight. Dans: Journal of Computing in Civil Engineering, v. 38, n. 3 (mai 2024). (2024):
- Digital Twin for Monitoring In-Service Performance of Post-Tensioned Self-Centering Cross-Laminated Timber Shear Walls. Dans: Journal of Computing in Civil Engineering, v. 37, n. 2 (mars 2023). (2023):
- A building information modeling‐fire dynamics simulation integrated framework for the simulation of passive fire protection in a mid‐scale cross‐laminated timber compartment: Numerical implementation and benchmarking. Dans: Fire and Materials, v. 47, n. 4 (juillet 2022). (2022):
- Insidious Safety Threat of Fatigue: Investigating Construction Workers’ Risk of Accident Due to Fatigue. Dans: Journal of Construction Engineering and Management, v. 147, n. 12 (décembre 2021). (2021):
- BrIM and UAS for bridge inspections and management. Dans: Engineering, Construction and Architectural Management, v. 27, n. 3 ( 2020). (2020):
- BIM–energy simulation approach for detecting building spaces with faults and problematic behavior. Dans: Journal of Information Technology in Construction, v. 25 (octobre 2020). (2020):
- Bridge construction progress monitoring using lidar and 4D design models. Dans: Automation in Construction, v. 109 (janvier 2020). (2020):
- Civil Integrated Management: An Emerging Paradigm for Civil Infrastructure Project Delivery and Management. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 2 (mars 2017). (2017):
- Tracking of secondary and temporary objects in structural concrete work. Dans: Construction Innovation, v. 14, n. 2 (avril 2014). (2014):
- Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System. Dans: Journal of Computing in Civil Engineering, v. 28, n. 4 (juillet 2014). (2014):
- Toward Automated Earned Value Tracking Using 3D Imaging Tools. Dans: Journal of Construction Engineering and Management, v. 139, n. 4 (avril 2013). (2013):
- Automated progress tracking using 4D schedule and 3D sensing technologies. Dans: Automation in Construction, v. 22 (mars 2012). (2012):
- The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components. Dans: Automation in Construction, v. 49 (janvier 2015). (2015):
- Computationally efficient change analysis of piece-wise cylindrical building elements for proactive project control. Dans: Automation in Construction, v. 81 (septembre 2017). (2017):
- Lessons from Using BIM to Increase Design-Construction Integration. Dans: Practice Periodical on Structural Design and Construction, v. 19, n. 1 (février 2014). (2014):
- IFC BIM-Based Facility Management Approach to Optimize Data Collection for Corrective Maintenance. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 31, n. 1 (février 2017). (2017):
- Assessment of compliance of dimensional tolerances in concrete slabs using TLS data and the 2D continuous wavelet transform. Dans: Automation in Construction, v. 94 (octobre 2018). (2018):
- Adaptive wavelet neural network for terrestrial laser scanner-based crack detection. Dans: Automation in Construction, v. 94 (octobre 2018). (2018):