Franz Tschuchnigg
- Comparison of preloading by fill surcharge and ground water lowering based on a case study. Dans: Geomechanics and Tunnelling, v. 17, n. 2 (décembre 2023). (2023):
- Optimization variant of the shear strength reduction method and its usage for stability of embankments with unconfined seepage. Dans: Computers & Structures, v. 281 (juin 2023). (2023):
- Potential applications of machine learning for BIM in tunnelling. Dans: Geomechanics and Tunnelling, v. 15, n. 2 (avril 2022). (2022):
- Bearing capacity of a strip footing placed next to an existing footing on frictional soil. Dans: Soils and Foundations, v. 60, n. 1 (février 2020). (2020):
- Corrosion damage to cantilever MR walls – Representation in tests and calculations. Dans: Geomechanics and Tunnelling, v. 12, n. 5 (octobre 2019). (2019):
- Geologische Grundlagen, geotechnische Planung und Auskleidung des neuen Kraftabstiegs Rodundwerk I. Dans: Geomechanics and Tunnelling, v. 12, n. 3 (juin 2019). (2019):
- Slope stability analyses considering non-associated plasticity: Application to boundary value problem. Dans: ce/papers, v. 2, n. 2-3 (juin 2018). (2018):
- Zur Beurteilung der Standsicherheit von Böschungen mit unterschiedlichen Verfahren. Dans: geotechnik, v. 40, n. 4 (décembre 2017). (2017):
- Safety assessment of existing retaining structures. Dans: Geomechanics and Tunnelling, v. 10, n. 5 (octobre 2017). (2017):